Easy. Email a link to the construction plans or a description of the scope and location of the project to office@soundfloorstoday.com
We estimate every project individually considering factors such as location, size and scope. Simply email us a link to the construction plans and we will provide a quote.
Washington, Oregon, Idaho, Montana & Alaska
Our lead time on materials is about two weeks. Although we stock materials at our home base, we need two weeks’ notice for scheduling.
Gypsum concrete is dry enough to walk on the next day after it is poured. So other trades can return to work on the surface. Depending on factors such as ventilation, temperature, thickness of the pour, gypsum-based underlayment cure time is about 10 to 14 days. A moisture test should be conducted before finished floor goods are applied.
In most construction projects we should install after drywall is finished. We can install before or after paint.